Critical-Path Planning and Scheduling: Mathematical Basis

Operations Research · 1961 · Vol. 9(3) · pp. 296–320

Abstract

This paper is concerned with establishing the mathematical basis of the Critical-Path Method—a new tool for planning, scheduling, and coordinating complex engineering-type projects. The essential ingredient of the technique is a mathematical model that incorporates sequence information, durations, and costs for each component of the project. It is a special parametric linear program that, via the primal-dual algorithm, may be solved efficiently by network flow methods. Analysis of the solutions of the model enables operating personnel to answer questions concerning labor needs, budget requirements, procurement and design limitations, the effects of delays, and communication difficulties.

Resource-Constrained Project SchedulingConstruction Project Management and PerformanceBIM and Construction IntegrationComputer scienceCritical path methodScheduling (production processes)Basis (linear algebra)ProcurementMathematical optimizationOperations researchParametric statisticsDual (grammatical number)Flow network
Citations
897
FWCI
13.81
field-weighted impact
References
5
Percentile
99%
vs. same field & year
Citations per year
Cited by
Resource-constrained project scheduling: Notation, classification, models, and methods
European Journal of Operational Research · 1999 · 1,484 citations
References
Citation Network

How this paper connects to the literature. Drag to explore, click any node to open that paper.

Critical-Path Planning and Scheduling: Mathematical Basis · Scinovex