Scinovex
articleTop 1% cited

Algorithms for Solving Production-Scheduling Problems

Operations Research · 1960 · Vol. 8(4) · pp. 487–503
Bernard GifflerGerald L. Thompson

Abstract

Algorithms are developed for solving problems to minimize the length of production schedules. The algorithms generate anyone, or all, schedule(s) of a particular subset of all possible schedules, called the active schedules. This subset contains, in turn, a subset of the optimal schedules. It is further shown that every optimal schedule is equivalent to an active optimal schedule. Computational experience with the algorithms shows that it is practical, in problems of small size, to generate the complete set of all active schedules and to pick the optimal schedules directly from this set and, when this is not practical, to random sample from the bet of all active schedules and, thus, to produce schedules that are optimal with a probability as close to unity as is desired. The basic algorithm can also generate the particular schedules produced by well-known machine loading rules.

Scheduling and Optimization AlgorithmsOptimization and Packing ProblemsManufacturing Process and OptimizationScheduleMathematical optimizationComputer scienceScheduling (production processes)Set (abstract data type)Production scheduleJob shop schedulingAlgorithmMathematics
Citations
785
FWCI
27.99
field-weighted impact
References
2
Percentile
99%
vs. same field & year
Citations per year
Cited by
A Review of Production Scheduling
Operations Research · 1981 · 777 citations
Citation Network

How this paper connects to the literature. Drag to explore, click any node to open that paper.